Non-Tariff Measure
- NTM classification
- B7: Product quality, safety or performance requirements
- Date when the measure came into force
- 21 April 2015
- Publication where the measure is specified
- UGANDA GAZETTE Vol. CVIII No. 20 of 21 April 2015
- Regulation where the measure is specified
- US ISO 9012:2008, Gas welding equipment — Air-aspirated hand blowpipes — Specifications and tests
- Country/Region applying the measure
- Uganda
- Description of the measure
- This Uganda Standard specifies requirements for air-aspirated hand blowpipes. This standard applies to blowpipes for brazing, soldering, heating, fusion and other allied thermal processes, which use a fuel gas and aspirated air (injector-type blowpipes), and are intended for manual use. This International Standard is applicable to:air-aspirated hand blowpipes which are fed with a fuel gas in the gaseous phase, at a controlled pressure by a regulator, through a gas supply hose;air-aspirated hand blowpipes which are fed with a liquefied fuel gas in the gaseous phase at the container pressure, through a gas supply hose; andso-called liquid-phase blowpipes which are fed with a fuel gas in the liquid phase, and where thermal evaporation takes place within the blowpipe. It does not apply to blowpipes in which the fuel gas leaves the injector in the liquid phase, or to so-called “cartridge” blowpipes where the gas supply is fixed directly onto the blowpipe and possibly constitutes the shank.
- Reference of the measure
- US ISO 9012:2008
- Measure also domestic
- Yes
Products affected by the measure.
- Description
- Gas welding equipment — Air-aspirated hand blowpipes
Countries/Regions affected by the measure.
{"transfer_retrieve_error":"Transferred complaint details could not be retrieved.","translate_error":"Text could not be translated"}
https://tradebarriers.org/img/flag_icons