Non-Tariff Measure

NTM classification
B82: Testing requirement 
Date when the measure came into force
12 April 2013 
Publication where the measure is specified
Uganda Gazette Vol. CV No. 17 of 12th April 2013 
Regulation where the measure is specified
US 945-2:2012, Pre-insulated flexible pipe systems – Part 2: Non bonded system with plastic service pipes — Requirements and methods of test 
Country/Region applying the measure
Uganda 
Description of the measure
This Uganda Standard specifies the methods of test for flexible, pre-insulated, direct buried district heating pipes with plastic service pipes and no bonding between the layers of the pipes. This standard is valid for maximum operating temperatures of 95 °C and maximum operating pressures up to 10 bar for a design lifetime of at least 30 years. This standard does not cover surveillance systems. 
Reference of the measure
US 945-2:2012 
Measure also domestic
Yes 

Products affected by the measure.

Description
Pre-insulated flexible pipe systems 

Countries/Regions affected by the measure.